Feb/18/09 08:45 AM Filed in:
Jokes
Contractor - A gambler who never gets to
shuffle, cut or deal.
Bid
Opening - A poker game in which the losing hand
wins.
Low
Bidder - A contractor who is wondering what he/she left
out.
Engineer's
Estimate - The cost of construction in Heaven.
Project
Manager - The conductor of an orchestra in which every musician is
in a different union.
Critical
Path Method - A management technique for losing your shirt under
perfect control.
OSHA
- A protective coating made by half-baking a mixture of fine print,
split hairs, red tape and baloney - usually applied at random with
a shot gun.
Strike
- An effort to increase egg production by strangling the
chicken.
Delayed
Payment - A tourniquet applied at the pockets.
Completion
Date - The point at which liquidated damages
begin.
Liquidated
Damages - A penalty for failing to achieve the
impossible.